Song Than Station is a crucial railway hub in Binh Duong, serving as a vital artery for North-South cargo transportation. The demand for Binh Duong trucks at Song Than Station is steadily increasing, requiring transportation services to be professional, reliable, and capable of handling large volumes of goods. This article provides detailed information about Song Than Station and its cargo transportation services.
Location and Role of Song Than Station in Cargo Transportation
Song Than Station is located in An Binh Ward, Di An City, Binh Duong Province, right at the foot of Song Than overpass. Strategically positioned on the North-South railway line, Song Than Station boasts a system of inter-provincial highways, and large seaports, facilitating convenient transportation connections.
Song Than Station manages an area of over 200,000 m2, including a modern system of warehouses, transportation vehicles, and loading/unloading equipment. Annually, Song Than Station handles over 500,000 tons of cargo, transporting and handling goods to stations nationwide.
Busy cargo handling activities at Song Than Station
Infrastructure and Transportation Capacity of Song Than Station
Song Than Station is continuously being upgraded to meet the increasing transportation demands. From the initial 3 railway tracks, the station now has 17 tracks with a capacity of over 350 carriages. The spacious warehouse system includes 5 warehouses, including a 2,500m2 cold storage facility equipped with anti-theft, lightning protection, and fire prevention systems.
The open storage yard, spanning over 5,000m2, is concrete-paved and equipped with a DEMAG crane with a lifting capacity of 30 tons, and 4 tire cranes with a lifting capacity of 40 tons. A team of over 500 workers operates 24/7, professionally trained, ensuring a loading and unloading capacity of 2,000 tons per day and night. The station aims to increase its handling capacity to 2,500 tons per day and night, while also electrifying and automating the processes of receiving, dispatching, and organizing train overtaking.
Cargo Transportation Services at Song Than Station
Many transport companies offer Binh Duong truck services at Song Than Station with diverse delivery and receipt options:
- Receiving goods at Song Than Station, delivering to Giap Bat Station or customer warehouses.
- Receiving goods at customer warehouses, delivering to Giap Bat Station or customer warehouses.
Railway transportation time is relatively stable, approximately 3-4 days (excluding the receiving day). The professional transportation process includes steps such as: information reception, cargo survey, quotation, contract signing, goods receipt, transportation, delivery, and payment.
Truck and Motorcycle Shipping Services at Song Than Station
In addition to cargo transportation, Binh Duong truck services at Song Than Station also include motorcycle shipping at competitive prices. Motorcycle shipping costs range from VND 600,000 to VND 650,000 per vehicle, depending on the type.
Choosing a Reputable Transport Company at Song Than Station
To ensure safe and efficient cargo transportation, customers should choose reputable, experienced, and capable transport companies. Selection criteria include:
- A large fleet of Binh Duong trucks at Song Than Station to meet diverse transportation needs.
- Modern facilities, spacious warehouses, ensuring cargo safety.
- Professional, transparent, and punctual working processes.
- Reasonable and competitive prices.
- Commitment to compensation for damages in case of risks.
Customers in need of cargo transportation or seeking Binh Duong trucks at Song Than Station are welcome to contact reputable transport companies for detailed consultation and quotes.